• Bare Metal Server

bms
  1. Help Center
  2. Bare Metal Server
  3. User Guide
  4. Network
  5. EIP
  6. Binding an EIP to a BMS

Binding an EIP to a BMS

Scenarios

To allow your BMS to communicate with the Internet, bind an EIP to the BMS.

Procedure

  1. Log in to the management console.
  2. Under Computing, click Bare Metal Server.

    The BMS console is displayed.

  3. Click a BMS.

    The page showing details of the BMS is displayed.

  4. Click the EIPs tab. Perform either of the following operation based on whether an EIP is available:
    • If an EIP is available, perform steps 8 and 9.
    • If no EIP is available, perform steps 5 to 9.
  5. Click View EIP.

    The EIP console is displayed.

  6. Click Assign EIP. On the displayed page, enter the bandwidth name, bandwidth size, and quantity, and click Assign Now

    The page for you to confirm EIP configuration is displayed.

  7. Click Submit.

    The page showing details of the BMS is displayed.

  8. Click Bind EIP.

    The Bind EIP page is displayed.

  9. Select the target EIP and click OK.
    NOTE:

    Only one EIP can be bound to a NIC.